Colo – 9th Floor Room III
Availability | |
Immediate (200 cabinets remain) | |
Q4 2015 (90 cabinets remain) | |
Electrical | |
Utility | 4160V-277/480V – 4,667 kVA – Landlord owned Paralleled XFMR distribution network |
EPS | (4) 2000kW Generators (N+1) |
UPS | (4) 720kW UPS Modules (N+1) |
Mechanical | |
Cooling Plant | (4) 250TR Air Cooled Chillers (N+1) |
Cooling Distribution | Chilled water riser from roof to data center |
Crac Units | N + 1 Crac Units |
Fire Protection | |
Pre-Action | |
Telecommunications | |
Direct to 9th Floor MMR | |
Building Management System | |
Andover |
Colo – 2nd Floor
Availability | |
Q3 2015 (608 cabinets remain) | |
Electrical | |
Utility | 277/480V – 6,500 kVA – Dedicated 2nd contingency utility spot network |
EPS | (4) 2000kW Generators (N+1) |
UPS | (12) 600kW UPS Modules (2N) |
Mechanical | |
Cooling Plant | (13) 130TR Dry Coolers (N+1) |
Cooling Distribution | Condenser water risers from roof to data center (2N Risers & Pumps) |
Crac Units | N + 1 Crac Units |
Fire Protection | |
Pre-Action | |
Telecommunications | |
Direct to 9th Floor MMR | |
Building Management System | |
Siemens/Automated Logic |
Colo – 11th Floor
Availability | |
Q1 2015 (130 cabinets remain) | |
Electrical | |
Utility | 277/480V – 3000A Service Switch – Fed via 2nd contingency utility spot network |
EPS | (1) 2000kW Generator (N+1) |
UPS | (2) 16kW UPS Modules, (4) 151kW DC Plants |
Mechanical | |
Cooling Plant | (13) 130TR Dry Coolers (N+1) |
Cooling Distribution | Chilled water riser from roof to data center |
Crac Units | N + 1 Crac Units |
Fire Protection | |
Pre-Action | |
Telecommunications | |
Direct to 9th Floor MMR | |
Building Management System | |
Andover |