Availability & Infrastructure

N

Over 1,650 cabinets available in the 360,000 SF building owned and operated first-class colocation space and over 110,000SF of additional space

N

23.5MW of power available. Additional power needs to be addressed as needed.

Contact Us

Shell Space

Availability

FloorPowerDate Available
5th Floor2MWImmediate
6th Floor5.7MWImmediate
8th Floor2.6MWImmediate
10th Floor3.2MWImmediate
12th Floor4MWImmediate
13th Floor2.9MWImmediate

Colo Room 7 – 6th Floor

Availability: 1.365 MW available

Utility PowerN+1 Parallel Redundant PSE&G 5kV Network Feeders
Emergency PowerN+1
UPS Power2N redundancy UPS backed power
CoolingN+1 chillers, pumps & cooling towers, 2N redundant risers, loop distribution with segmentation valves
CRAC UnitsN+1 within room

 

Compartment 1 – 6th Floor

Availability: 1 Compartment (Single Tenant)

Utility Power  N+2 Parallel Redundant PSE&G
Emergency PowerN+1 parallel redundant diesel engine generator plant
UPS PowerA-B-C Distributed Redundant system with (3) 1000kW modules
CoolingN+1 chillers, pumps & cooling towers, 2N redundant risers, loop distribution with segmentation valves
Full SpecsInquire here  

 

Colo Room 2 – 9th Floor

Availability: 30 cabinets immediately available

Utility PowerN+1 Parallel Redundant PSE&G 5kV Network Feeders
Emergency PowerSingle Engine
UPS PowerN+1 Parallel Redundant UPS System
CoolingMix of N+1 parallel redundant glycol chilled water and DX package units
CRAC UnitsN+1 within room

 

Colo Room 3 – 9.5th Floor

Availability: 30 cabinets immediately available

Utility PowerN+1 Parallel Redundant PSE&G 5kV Network Feeders
Emergency PowerN+1 Parallel Redundant Generator Plant
UPS PowerN+1 Parallel Redundant UPS System
CoolingN+1 parallel redundant chilled water glycol chillers
CRAC UnitsN+1 CRAC Unit Configuration within Compartment.

Colo Room 4 – 2nd Floor

Availability: 100 cabinets and 600kW immediately available in Compartment 4.

Compartment 1:
Utility Power                                                     
Emergency Power                          OCCUPIED
UPS Power
Cooling
CRAC Units

 

Compartment 2:
Utility Power
Emergency Power                OCCUPIED
UPS Power
Cooling
CRAC Units

 

Compartment 3:
Utility Power
Emergency Power                 OCCUPIED
UPS Power
Cooling
CRAC Units
Compartment 4:
Availability 
Utility Power 
Emergency PowerOCCUPIED
UPS Power 
Cooling 
CRAC Units 
Compartment 5:
Utility Power 
Emergency Power                            OCCUPIED
UPS Power 
Cooling 
CRAC Units 

 

Comm Core:
Utility Power 
Emergency Power                OCCUPIED
 
UPS Power 
Cooling 
CRAC Units 

 

Colo Room 5 – 11th Floor

Availability: 70 cabinets immediately available (DC Plant)
Compartment 1:
Utility PowerN+2 Parallel Redundant PSE&G Transformer Vault
Emergency PowerN Generator Plant
UPS PowerDC Rectifier Plant
CoolingN+1 Parallel Redundant Air-Cooled Chillers
CRAC UnitsN+1 CRAC Unit Configuration within Compartment.

Colo Room 6 – 4th Floor

Availability:

 AvailabilityIT Power Available
Compartment 19 Months935kW
Compartment 23-5 Months625kW
Compartment 39 Months1.58MW

 

Compartment 1:
Utility PowerN+2 Parallel Redundant PSE&G Transformer Vault
Emergency PowerN+1 Parallel Redundant Generator Plant
UPS Power2N Distributive Redundant UPS System
CoolingN+1 Configuration (1 Dry Cooler Associated with 1 CRAC Unit)
CRAC UnitsN+1 CRAC Unit Configuration within Compartment.
Compartment 2:
Utility PowerN+2 Parallel Redundant PSE&G Transformer Vault
Emergency PowerN+1 Parallel Redundant Generator Plant
UPS Power2N Distributive Redundant UPS System
CoolingN+1 Configuration (1 Dry Cooler Associated with 1 CRAC Unit)
CRAC UnitsN+2 CRAC Unit Configuration within Compartment.
Compartment 3:
Utility PowerN+2 Parallel Redundant PSE&G Transformer Vault
Emergency PowerN+1 Parallel Redundant Generator Plant
UPS Power2N Distributive Redundant UPS System
CoolingN+1 Configuration (1 Dry Cooler Associated with 1 CRAC Unit)

165 Halsey Infrastructure & Availability